Water treatment
In this area MIKRO KONTROL offers complete engineering and „turn-key“ solutions, which include: consulting, technical documentation in the form of conceptual, major and detailed design, development of PLC, SCADA and HMI application software, parameterisation of modern programmable devices, production of control cabinets for measurement, control, protection, regulated and unregulated electric drives, delivery and installation of process and electrical equipment and instrumentation, testing and commissioning, training, maintenance.
During year 2007, the modernization project of 7 pumping station across Belgrade city's territory took place. This project has been carried out by Japanese company EBARA, while MIKRO KONTROL was again selected as subcontractor by BVK.
Mikro Kontrol realized electro projecting of control system of Plant for neutralization sulfuric acid
Mikro Kontrol realized electrical wiring project for blowers drive, acquisition and delivery of the equipment, cable traces routing and wiring, process development algorithm based on user-defined cycles, commissioning and performance verification during exploitation.
The Government of Japan, through its agency JICA (Japan International Cooperation Agency), has approved JKP BVK (the Belgrade water supply) a donation for the implementation of projects to improve the water supply in Belgrade. Along with the main contractor, the Japanese company EBARA, Micro Kontrol participated in the project, as the sub-contractor.
The reconstruction filter installation. MIKRO KONTROL performed a development of automatic control system for filter installations in Water Factory “Banovo Brdo”, Belgrade like a subcontractor of the company "RAD GM AD".
In the renovation of Derventa water supply system Mikro Kontrol delivered control and supervisory system based on GPRS communication of date exchange to the following locations: Koraće, Bilića Vrelo, Babino Brdo, Tomasovo Brdo, Gakovac, Lupljanica, Vrhovi, Rabić.
Mikro Kontrol has realized the reconstruction of the pumping station IBRIFOR, HE Đerdap.
Delivered control system consisting of PLC, touch panel, frequency inverters, continuous level and pressure measurer ..
The delivered control system carries out the various demands of technological process.
he state of art technologies in the control system and communication field provides customers with reliable, efficient and comfort operation of their production plants..
For Kraljevo Water Supply and „Žičko Polje“ well plant several control and supervisor systems were delivered and installed.
The delivered control system carries out the requirements of the technological process..
In order of water supplying system better functioning as well as for more efficient use of water resources in water supply system of Sremska Mitrovica, an automation system has been delivered that covers control and monitoring of several locations.
Upstream pumping station Ada Ciganlija has an important role in Sava lake’s hydro technical system and is one of the most important facilities in JP Ada Ciganlija. Mikro Kontrol carried out full reconstruction of pumping station’s electro part.
Mikro Kontrol has realized the Control Systems of Pumping Station Orahovac and Reservoir Dobrota 1, Dobrota 2 and Škaljari
The line’s control system is implemented with Omron’s PLC, a touch panel and SCADA application.
Mikro Kontrol has realized the Control System for Sewerage Pumping Station “No. 7”
The control system consists of two PLCs and two frequency regulators, a SCADA computer, measurement instruments as well as of other accompanying equipment.