References
References
BELGRADE WATER SUPPLY AND SEWERAGE, Control System and Electrical Works on Pumping Station “Ada Ciganlija”


Control System and Electrical Works on Pumping Station “Ada Ciganlija”Upstream pumping station Ada Ciganlija has an important role in Sava lake’s hydro technical system and is one of the most important facilities in JP Ada Ciganlija.

Functions of this pumping station are:

pump over lake water from Sava lake into “Small lake,

pump over lake water from Sava lake into Čukarica sleeve,

pump over lake water from “Small lake” into Čukarica sleev


Mikro Kontrol carried out full reconstruction of pumping station’s electro part that enclosed:

Electro equipment delivery: power cabinet with measurement equipment, general protection and shutter drive’s automation cabinet, cabinets of drives of drowned pumps 110 KW and 45 KW with soft starters and general consumption cabinet,

Work execution on electro installation of pump drives and motor shutters, domestic wiring and lightning conductor installation,

contractor’s electro draft and electro draft of carried out facility

Control System and Electrical Works on Pumping Station “Ada Ciganlija”






News

MIKRO KONTROL d.o.o.
Vase Pelagica 30
11000 Belgrade, Serbia
+381 (0)11 3699 080
+381 (0)11 3699 939
office@mikrokontrol.rs
Powered by BeoNET